HVAC Renovation of Hatem Bridge Building

Hatem Bridge HVAC Renovations

November 2012 – INTECaec is selected by URS and MDTA for the architectural and electrical designs to support HVAC renovations in the Hatem Bridge Administration building. January 2014 – INTECaec submits the final design drawings, specifications, and cost estimates. October…
engineering designs for Dance Place

Engineering Designs for Dance Place

In late 2011, the owners of Dance Place as well as Hickok Cole Architects approached INTECaec to provide mechanical, electrical, plumbing, and fire-protection engineering designs, construction documents, and construction administration.  The project involved the partial demolition and renovation of 8,500…

Nice Bridge – HVAC Upgrades

April 2012 – INTECaec, as hired by URS, provides MDTA with Mechanical, HVAC, electrical drawings, cost estimates and specifications for the Maintenance Building and Vehicle Storage Building at Harry W. Nice Bridge in southern Maryland.  Project included radiator valve retrofits, piping…

SHA Westminster Shop HVAC Upgrades

May 2012 – URS hires INTECaec to perform the electrical design for HVAC upgrade renovation at SHA Westminster Maintenance and Vehicle Storage Buildings, Westminster, Maryland.  Detailed demolition plans and cost estimates were prepared.  Design included replacement of existing multizone split system…