Skip to content
  • Building Inspection Services, Engineering, Major Equipment Assessments, Mechanical

SHA – HVAC Engineering Services – Headquarters at Hanover, MD

2014 – INTECaec is hired under URS contract for SHA (Maryland State Highway Administration) at the Hanover Headquarters, Facility Management Division in Hanover, Maryland, to perform Project Management and Project Engineering Services.  We performed Site Inspections for damage, mold levels…

  • February 10, 2015
  • Engineering, Mechanical

SHA – Vehicle Lifts at Annapolis and La Plata Maintenance Facilities

July 2012 – URS hires INTECaec to provide plumbing and mechanical design and construction documents for parallelogram and scissor type vehicle lifts at SHA’s Annapolis and La Plata Maintenance Facilities. September 2013 – INTECaec and URS submit Final Design Documents to…

  • February 6, 2015
  • Architecture, Construction Administration, Electrical, Engineering, Mechanical

Nice Bridge – HVAC Upgrades

April 2012 – INTECaec, as hired by URS, provides MDTA with Mechanical, HVAC, electrical drawings, cost estimates and specifications for the Maintenance Building and Vehicle Storage Building at Harry W. Nice Bridge in southern Maryland.  Project included radiator valve retrofits, piping…

  • February 12, 2015
  • Electrical, Engineering, Facility Assessments, Mechanical, Utility Analysis

WC Smith – JETU PEPCO Study

August 2014 – INTECaec is hired by WC Smith to perform Electric Rate Study services related to individual meter conversion involving 10 buildings and 426 apartments in Washington, DC.  INTECaec surveyed the site to verify existing conditions and created architectural…

  • February 4, 2015
  • Construction Administration, Engineering, Facility Assessments

SHA Westminster Shop HVAC Upgrades

May 2012 – URS hires INTECaec to perform the electrical design for HVAC upgrade renovation at SHA Westminster Maintenance and Vehicle Storage Buildings, Westminster, Maryland.  Detailed demolition plans and cost estimates were prepared.  Design included replacement of existing multizone split system…

  • January 28, 2015
  • Construction Administration, Electrical, Engineering, Facility Assessments

MDOT – MVA Salisbury Plumbing and Lighting

INTECaec worked in conjuction with URS to renovate two restrooms, public and employee , brought up to current ADA code, with several more plumbing fixtures.  INTECaec provided the plumbing design with demolition and new work plans, risers, specifications and cost estimate.…

  • September 5, 2014
  • Construction Administration, Engineering, Mechanical

SHA Keyser’s Ridge & Hagerstown – Vehicle Lift Replacements

July 2012 – INTECaec is hired by URS to provide plumbing design plans for new floor drains and pump basins for the lift pits required for new Vehicle Lifts at SHA’s Keyser’s Ridge and Hagerstown sites.  Design included plumbing, air…

  • February 2, 2015
  • Electrical, Engineering, Facility Assessments, Mechanical, Utility Analysis

1754 Lanier LLC – PEPCO DCHA Study

August 2014 – 1754 Lanier LLC hired INTECaec to perform an energy study and electric rate study for 31 metered apartments in Washington DC. Services included:  Site visit to measure building and document existing conditions, creation of base drawings in…

  • February 2, 2015
Prev
1 2 3
Next
  • COMPANY
  • PORTFOLIO
  • CUSTOMERS
  • TEAM
  • CONTACT
  • LOGIN

Services

Architecture  ·   Building Inspection Services  ·   Construction Administration  ·   Electrical  ·   Engineering  ·   Facility Assessments  ·   Fire Protection  ·   Historic Preservation  ·   Interior Design  ·   Landscape Architecture  ·   Life Safety Analyses  ·   Major Equipment Assessments  ·   Mechanical  ·   Programming  ·   Schematic Design  ·   Space Planning  ·   Utility Analysis

  • INTECaec
  • Firm
  • Portfolio
  • Customers
  • Team
  • Contact Us

Copyright © 2025 INTECaec