July 2012 – INTECaec is hired by URS to provide plumbing design plans for new floor drains and pump basins for the lift pits required for new Vehicle Lifts at SHA’s Keyser’s Ridge and Hagerstown sites. Design included plumbing, air connections, and conduit for hydraulic lines.
October 2013 – Final bid documents are submitted to SHA.
February 2014 – INTECaec is hired by URS to provide Construction Administration services, including architectural, mechanical, plumbing and electrical oversight.
September 2014 – Construction is completed.