September 2012 – INTECaec is hired by URS to design a new HVAC system and provide an energy evaluation report for SHA’s Friendsville Restroom Pavilion.
May 2013 – INTECaec submits final report and design drawings to SHA.
November 2013 – URS hires INTECaec to perform Construction Administration services.
April 2014 – Construction is completed.