INTECaec worked in conjuction with URS to renovate two restrooms, public and employee , brought up to current ADA code, with several more plumbing fixtures. INTECaec provided the plumbing design with demolition and new work plans, risers, specifications and cost estimate.
A similar design effort for lighting design was required providing for lighting to be replaced throughout the entire building interior, and on the exterior of the building.
INTECaec also served as construction administrator and was responsible for reviewing Plumbing and Electrical Lighting as-builts prepared by the Contractor, and providing final as-built / record documents electronically to URS for incorporation into the MVA set.